来源:
《安全与电磁兼容》2005年第13期
作者:陈嵩 沙斐 肖恒杰 等(34)
3m法半电波暗室改造施工案例
Reconstruction of a 3 Meter Semi-anechoic Chamber
摘要 介绍了北京交通大学3米法半电波暗室改造施工过程中遇到的问题、解决方案以及在暗室施工中应注意的各种事项。
关键词 EMC半电波暗室 改造 施工 解决方案
Abstract This article gives the introductions of the reconstructing process of a 3 meter
semi-anechoic chamber in Beijing Jiaotong University which is designed for EMC-
compatibility measurements. Problems that were encountered are discussed,which
include improved designs,executive proceedings,solutions, and noticeable issues.
Keywords semi-anechoic chamber, reconstruction, trouble-shootings